Expert Soil Stabilisation and Plant Hire, Operating from Lancashire

Site Waste Management Plans

It is important that Designers and Main Contractors are aware of their obligations with regard to Site Waste Management Plans (SWMPs) and realise that treatment and use of unacceptable materials (U1A & U1B), previously sent to tip, will now play a major part in their compliance with SWMPs and have a significant contribution to value engineering.

Combined Stabilisation can also investigate incorporating general waste into the cohesive or granular matrix of general fills or landscape materials.

For more information on SWMPs please visit:

http://www.netregs.gov.uk/netregs/sectors/1842950/1843542/1865635/?version=1&lang=_e

Search Site:
© Combined Soil Stabilisation Ltd. :: Cranfield Road :: Lostock Industrial Estate :: Bolton :: Lancashire :: BL6 4SB
T: 01204 675104 :: F: 01204 675105 :: E:sales@combinedssl.co.uk :: Company No: 01446451 :: VAT No: 337 427 254

© 2011 Combined Soil Stabilisation, Web design & Search Engine Optimisation by ECS Software

256675 Total Page Visits since 1/2/2008