Expert Soil Stabilisation and Plant Hire, Operating from Lancashire
Soil Stabilisation

Soil Stabilisation has many attractions in today's construction market.
Cost and environmental benefits figure largely in the appeal of the soil modification process which enables granular and cohesive soils to be upgraded by the in-situ mixing of binders with the host material.
Typical apllications:
- Waterlogged site (rapid reduction of moisture content )
- Car and lorry parks
- Foundations for floor slabs
- Highway pavement construction
- Airport runways,taxiways and aprons
- Reclamation , remediation of contaminated land
These are three levels of treatment in the stabilising process:
1) Modification / Improvement
This is the reduction of high moisture content in otherwise acceptable materials to enable the excavation, placing and compaction of general fill to be carries out in an efficient and economical manner. This is commonly done by the introduction of small amounts of quicklime, typically 0.5% to 2.5% by dry mass ( the required amount is usually determined by basic laboratory monitoring ).
2) Stabilising
The mixing of binders and water with the host material to give a lightly cemented product with long term strength and durability. The proportions of the mix constituents are designed and proved by laboratory and engineer checks.
3) Enhanced Stabilising
This is a development of stabilising, giving a higher quality material with better performance. Commensurate with this are more stringent design requirements and tighter on-site control and testing.
|
© Combined Stabilisation :: Riverside Industrial Estate :: Hermitage Street :: Rishton :: Lancashire :: BB1 4NF T: 01254 888818 :: F: 01254 888887 :: E:sales@combined-stabilisation.co.uk :: Company No: 4317538 :: VAT No: 787350984 |